Attached
Integrated into the main house and finished to the same standard — able to serve as living space day to day, or as a private self-contained unit.
ADU Development · Los Angeles
Thornton Development Group designs, permits and builds accessory dwelling units across Los Angeles — most often as part of a larger development, and on select standalone projects. One firm as designer and contractor, start to finish.
How We Approach ADUs
An ADU adds permitted, finished square footage to a property — a guest house, a rental unit, space for family, or simply more of what a lot can carry. California has made them meaningfully easier to permit than they once were. If the question is how many separate homes a lot can carry rather than one additional unit, that is a lot-split question instead — and near transit, SB 79 may allow considerably more. See all the California housing laws that bear on a Los Angeles parcel.
Most of the ADUs we build are designed alongside a main residence from the start, so the two read as one property rather than a house with something added behind it. We also take on select standalone ADU projects where the site and scope are a fit.
There is no minimum project size. We quote each project on its own merits and will tell you honestly if it isn’t right for us. If you are still at the budgeting stage, start with what an ADU costs in Los Angeles.
Configurations
Integrated into the main house and finished to the same standard — able to serve as living space day to day, or as a private self-contained unit.
A separate structure on the lot, common on larger hillside and estate parcels where there is room to place it well.
An ADU counted into the unit mix of a ground-up multifamily building, adding a home without expanding the envelope.
Permitting a lot for future ADUs so the capacity exists whether or not it is built in the first phase.
Built & Building
Fourteen accessory dwelling units across eleven TDG projects — eleven delivered, three under construction. Each of these is a main residence or multifamily building with an ADU, not a standalone unit — which is how most ADUs actually get built. Configuration and status are noted on each.
Attached · Completed 2026
Detached · Under Construction
Attached · Completed
Detached · Completed
Within Multifamily
Attached · Completed
Attached ×4 · Stabilized Rental
Attached · Stabilized Rental
Attached · Completed
Detached · Under Construction
Attached · Under Construction
Entitlement · Potential
A Closer Look
The fully permitted attached ADU integrates into the house as a large family room, bedroom, and full bath — finished to the same standard as the main residence.
It can also be delivered as a private one-bedroom, one-bath unit with its own living area and kitchen: an in-law suite, a rental, a studio, a gym, or an office. Same structure, two very different uses, decided by whoever owns it.
What It Costs
We quote every ADU after seeing the property, because the site decides the number far more than the square footage does. These are the variables that move it most — in roughly the order they matter.
A detached structure needs its own foundation, its own envelope, and its own service runs. An attached unit shares walls and often shares systems. On the same lot, the same interior square footage can differ substantially between the two.
Sewer, water, gas and electrical have to reach the new unit. A detached ADU at the back of a deep lot can carry a materially longer trenching run than one placed near the main house, and whether the existing panel has capacity decides whether an upgrade comes with it.
Hillside parcels are where ADU budgets move most. Grading, retaining, caissons and restricted equipment access are all site conditions rather than design choices, and they are set before anyone draws anything.
Converting an existing garage carries different work — and different risk — from building new. Conversions are also not covered by the TDG Builder Warranty; ground-up new construction is. See the TDG Builder Warranty for terms.
The last variable, and the one owners assume is the first. An ADU finished to the standard of a TDG main house costs more than a rental-grade build, and that is a decision about what the space is for rather than a constraint the lot imposes.
We give a written estimate after reviewing the property. All figures are project-specific — we do not publish a price per square foot, because the sites we work on rarely support one.
What The Law Allows
State ADU law was consolidated into Government Code sections 66310–66342 and has been loosened repeatedly since 2020. Most owners are working from an older version of the rules than the one actually in force. These are the provisions that change what a Los Angeles lot can carry.
On a lot with a proposed or existing single-family home, the state requires ministerial approval of one detached, new-construction ADU — which a city may cap at 800 square feet, with side and rear setbacks of no more than four feet — and it may be combined with a junior ADU created inside the existing house.
SB 1211 took effect on 1 January 2025 and raised the ceiling to eight detached ADUs on a lot with an existing multifamily building, capped at the number of units already there. On a lot with a proposed multifamily building the figure is two. This is the provision that matters most to the work we do, and the one owners of small apartment buildings are least likely to know about.
Separately from the detached allowance, a city must permit at least one ADU — and up to 25 per cent of the existing unit count — carved out of space in an existing multifamily structure that is not already livable: storage rooms, boiler rooms, passageways, attics, basements and garages, provided each unit meets state building standards.
Also under SB 1211: uncovered off-street parking spaces removed in order to build an ADU no longer have to be replaced elsewhere on the site. On a tight lot that single change is often what makes a unit fit.
AB 1033 has been in effect since January 2024, and it is the one most often misread. It does not give you the right to sell your ADU. It lets a city adopt an ordinance permitting an ADU to be conveyed as a condominium, which means the answer depends entirely on whether your jurisdiction has adopted one. Ask before you plan an exit around it.
AB 2533 extends California’s ADU amnesty to unpermitted units built before 2020 and sets out a route to permitting them. If you bought a property with a converted garage of uncertain status, there is a process — and it is a better one than discovering the problem at escrow.
Knowing the rule is not the same as getting the unit approved. Local ordinances vary, several Los Angeles–area cities have ordinances the state has formally found non-compliant, and hillside parcels bring their own overlay of requirements on top of all of it. We handle design, permitting and construction in-house, so the drawings are made by the people who have to build them and one contractor carries the schedule.
The above is general information about California law as of 2026, not legal advice, and statutes change. Confirm what applies to your property with your jurisdiction or your own counsel before relying on it. See our Legal Disclosures.
Good Questions. Straight Answers.
Both, though most of our ADUs are designed as part of a larger development. We take on select standalone ADU projects where the site and scope make sense. Send us the address and we’ll tell you either way.
It depends on lot size, setbacks, topography, and what you want the space to do. On larger hillside parcels a detached structure usually places better; on tighter flat lots an attached unit often makes more sense. That determination is part of the feasibility assessment.
There is no honest per-square-foot answer, which is why we don’t publish one. Attached versus detached, how far utilities have to run, slope and soils, and whether it is new construction or a conversion all move the number before finish level is even discussed — see what drives cost above. We give a written estimate after reviewing the property.
Yes. Every ADU requires permits, and hillside parcels frequently require more of them. California has made ADUs meaningfully easier to permit than they once were, but easier is not the same as exempt. We handle design, permitting and construction in-house, so there is one point of accountability rather than a designer, an expediter and a builder pointing at each other.
Yes. Design, permitting, and construction are handled in-house, the same as our ground-up developments — so there is one point of accountability rather than a designer, an expediter, and a builder pointing at each other.
It varies with scope, site conditions, and city processing. We give a written estimate after reviewing the property. All timelines are estimates, not guarantees — actual schedules depend on scope, site conditions, city processing, and timely client funding and decisions.
Since 1 January 2025, state law requires a city to allow up to eight detached ADUs on a lot with an existing multifamily building, capped at the number of units already on the lot — two if the multifamily building is only proposed. Separately, you may be able to convert non-livable space inside the existing building into additional units, up to 25 per cent of the existing unit count. Which of those a specific parcel actually supports is a feasibility question, not a formula — see what the law allows.
Only if your city has adopted an ordinance allowing it. AB 1033 lets jurisdictions permit an ADU to be conveyed as a condominium; it does not create the right by itself, and adoption across Los Angeles County is uneven. Do not underwrite a project on a separate sale without confirming your jurisdiction first.
Often, yes. California’s ADU amnesty provisions extend to unpermitted units built before 2020 and set out a path to permitting them. What that path costs depends on how the unit was built and what has to be opened up to prove it. We will tell you what we find rather than what you want to hear.
Design, permitting and construction are run in-house, the same as our ground-up developments. You are not coordinating a designer, a permit expediter and a separate contractor and hoping their schedules agree — one team carries the project from feasibility through final inspection.
Ground-up new construction carries the TDG Builder Warranty under California SB 800. Remodels and conversions are not covered; workmanship on those is governed by the applicable construction contract. See the TDG Builder Warranty page for full terms.
Send us the address. We’ll come back with what the property supports, what it would cost, and what it should be worth.